There must be better ways....
We have decided in early 2018 to build an entire new kitchen in our house – including new floor, floor heating, new windows, new design, new sink incl. Cooker, new cooking station, new M-Head new everything. Selecting a trustworthy partner as a turn key supplier as a general contractor was our way forward. The general contractor opted for HTH as the supplier for the kitchen design, cabinets, sink and electrical appliances. According to the joint planning of the general contractor together with HTH the construction period was estimated at app. 3 months. The basic construction work was going according to plan and after the floor had completed we were ready to receive the kitchen – to be installed by HTH “specialist”. It was then that we learned that the main plate for the kitchen was not ordered and consequently not delivered at the time when the assembly work was scheduled to begin. We also learned that the cooking station was wrongly ordered. Nevertheless HTH began to install the different cabinets and some makeshift arrangements for the main plate, cooking station – oh yes: the M-Head was not ordered as well… As the thickness of the final main plate was decisive for the placement of the window the kitchen window was not to be installed – which left us for about 6 weeks with a wooden cover of the wall opening. We had also agreed on the installation of an “apotheker closet” for spices and similar kitchen utensils. A design well known which were not considered problematic by the “specialist” of HTH. When the main plate finally arrived it got damaged (design was concrete, it broke partly at 4 locations) and we realized that the entire plate was not straight. The “apotheker closet” was a patchwork of 4 front plates kept together with two screwed on metal plates on the inside plus three standard element to carry the content. A design which rendered three compartments almost useless as access was too small and three compartments so wide that the space could not at all be used in a sensible manner. The total construction was completely out of water resulting in a tilting of the closet which made it extremely difficult to open and close. We complaint towards HTH and with the support of the general contractor managed to get an answer after several weeks of follow up. That was the answer we received from HTH: 1. The plate cannot be replaced as the production process does not allow for straightness – but they will send a service engineer from the supplier to patch up the cracks 2. There is no solution for the apotheker closet other than changing it into a three part design (funny that this kind of closet is a standard for which e.g. a Dutch do-it-yourself chain offers a complete set for taking home and install yourself…) – we did not agree on the patch up of HTH lousy design… 3. The M-Head was never formally ordered – that why it was not delivered…????? As we by then were very well aware of the performance level of HTH we decided to order it ourselves and have the General Contractor mount it Now we are 6 months down the line and there is still no action taken to rectify the blunder HTH has committed. We have now decided to ask our general contractor to remove the HTH design and trash can it – replacing it with a design that is delivering on the agreed function. All in all: HTH was founded by the brothers Hans Henning and Tonny Haahr in 1966. The two skilled craftsmen had previously worked with kitchens for other suppliers, but were not impressed. "It needs to be done better," they thought. Today we are convinced that there must be better ways to do a kitchen than using HTH – “specialists”. The performance of HTH – communication and solution far below industry standard, not even getting close to fulfilling expectations, and certainly not living up to the vision that they proclaim on their website.