Plan 1 year in advance for an EV charger, solar, or heat pump
Had to have some work done before an EV charger could be fitted. Have never known such a poorly managed company. The communication has been appauling. My house was on a looped supply so needed unlooping and the fuse upgrading before EV work could start. I applied in Oct 2025. In Dec 2025 a surveyor came out to check what work needed doing and said someone one be in touch to arrange it. Weeks pass and I hear nothing, so got in contact with them. They had closed the job. Apparently I didn't fill in the paperwork, and when I checked, they had sent an email to my EV installer and copied me in, never addressing me directly. Then in an attachment of the email, was the instruction that I needed to fill in the paperwork and return it. I had switched EV installer in that time so they had nonobligation to tell me, but likewise Northern Powergrid shouldn't be given me instructions in an email where I am not mentioned. I filled in the paperwork and sent it off. I received notice back that the work "usually takes 6 weeks". I then heard nothing again. Many times I chased for updates. 6 weeks came and went. I raised a complaint but still nothing. Eventually I got in touch with Energy Ombudsman 8 weeks after I raised the complaint (the minimum time), they then replied the following day. In their respos e, rather than looking into the matter at all or apologising for the lack of communication, they just highlighted occassions where they had communicated. This only covered form Mar 2026 though, a date after I first raised my complaint, so they were addressing nothing which was in my complaint. Eventually I was contacted about the work, and was told it would be at least 12 weeks. When I questioned this I was told this was due to the road needing to be closed, something they already knew about when they said it "usually takes 6 weeks". The first available date being Aug 2026. At one point I made an information request for avergae completion times for unlooping works, and they admitted their system does not provide that data, despite quoting it "usually takes 6 weeks". Energy Ombudsman got involved and when Northern Powergrid responded to them, they basically denied any issue, even suggesting I did not allow enough time for then to respond to the complaint (8 weeks). Energy Omdusman suggested a goodwill payment of £100 which I noted is probably less than minimum wage for the time I have spent dealing with effectively managing Northern Powergrid and dealing with the complaints process, but they remained fixed on that amount sttaing it is not a payment related to the time spent, stress or any similar factor. When I asked how it is calculated, they refused to elaborte. They also refused any appeals, peer review, or escalation. Since then I am still trying thlo get my charger installed. In the 10 months it took Northern Powergrid to do the 6 weeks worth of work, the price of the charger has gone up. I am still trying to find out the details but it seems that some or maybe all of the goodwill payment may now need to be used to pay for the increased cost of the charger. What I considered already a low amount may now be effectively void anyway. When the planet is burning, I will blame Northern Powergrid for their part in making switching to green technology a year long process, and this will only get worse as all of the older properties (most attached pre-1990s) have to switch from gas to heat pumps.