Incomplete Solar Expansion – No Final Completion, Abandoned Debris, No Response

I previously had a positive experience with NRG Clean Power in 2024 when they successfully installed solar panels at my home in Stockton, CA. That is why I returned to them in 2025 to expand the system by doubling the panels and batteries to reduce PG&E costs and work toward living off-grid. The sales, accounting, and planning departments handled their roles promptly and professionally. The project proceeded smoothly until it was assigned to the project coordination team on December 1, 2025 (first email from Jared Smith), after which progress stopped entirely. The system remains non-operational more than 30 days past the contracted completion date of January 31, 2026. I have paid 80% ($42,481.34) of the $53,601.68 contract, but NRG has not completed the installation, submitted for final inspection (City of Stockton Permit: SA20251120-150-1113-1784-A), or applied for PG&E Permission to Operate (PTO). Key issues include: No code-required heat detector was ever shipped or provided (confirmed by subcontractor on February 18, 2026; technician could not install it). Mounting rails and construction debris have remained abandoned on my property since my initial complaint on January 27, 2026 (after installers left unfinished on January 24), creating a trip hazard and potential liability. On February 18, 2026, a subcontractor performed minor work (electrical box, stickers, some part collection after my in-person complaint) and took photos for HDM Renewable Finance (PPA financier), but was not authorized or equipped to finish the install or remove rails. No response to my outreach attempts on February 26 and March 5, 2026 — total communication blackout for over 19 days. PG&E Status: PG&E confirmed on March 9, 2026 (Project #132 529 249) that NRG submitted the interconnection application in December 2025, but it remains pending solely due to lack of final building permit approval from the City of Stockton. The City permit is still issued/open with no final inspection requested. I am incurring ongoing PG&E costs due to the delay and non-production. I am withholding the final $10,620.34 until completion. I have filed formal complaints: CSLB solar complaint for abandonment under B&P §7107 CSLB #NA2025014567 BBB complaint submitted March 9, 2026. I request NRG: Remove all abandoned materials (rails/debris). Supply and install the required heat detector. Commission/turn on the system and submit for inspection/PTO. Reimburse excess PG&E bills since January 31, 2026 (estimated $200–$350/month). I am willing to mediate and hope for prompt resolution. Andrew Ramos Stockton, CA

Date of experience: 9 Mar 2026

Our team checks every report against the guidelines. A review is never removed just because it’s negative.