Report this review

MM
Mr Miah
GB · 1 review
26 Oct 2026

Three failed repair visits with wrong parts — Still unresolved despite written promises.

Three failed repair visits with wrong parts — Still unresolved despite written promises Update (17 November 2026): Following Clearview’s public reply below and written assurances from my Project Manager that the full structural aluminium section had been ordered, an engineer attended today and once again arrived with the wrong materials. To summarise the ongoing experience under Contract Ref: CV321720726: During installation, fitters bent and damaged the structural aluminium vertical post holding the door, roof, and side panel together. Since then, Clearview has failed three consecutive times to fix the damage due to bringing the wrong parts: 1. 12 October 2026: Engineer attended without the required component. 2. 26 October 2026: Engineer arrived with cosmetic plastic covers instead of the structural aluminium post, and noted that replacing the post risks damaging the surrounding door frame. 3. 17 November 2026: Engineer turned up with the wrong materials for a third time, directly contradicting written confirmation that the correct part had been ordered in full. I have now wasted three separate appointments waiting for a basic repair that Clearview repeatedly failed to prepare for. Given the premium price paid, the lack of basic quality control and coordination is unacceptable. I am now pursuing a formal price reduction and a Section 75 claim through my credit card provider to resolve this matter.

Date of experience: 26 Oct 2026

Our team checks every report against the guidelines. A review is never removed just because it’s negative.