Bad workmanship (boiler crew were…
Bad workmanship (boiler crew were great) and dishonourable Director I initially gave 2 stars as the boiler was installed professionally & the crew were brilliant, polite, respectful, the crew that completed the loft insulation could not communicate in English. The extractor fans and trickle vents were fitted by amateurs. When I moved to this property in 2018 the whole loft was boarded before they started and they took up all the original boarding, the brief was to top up existing insulation but they didn't tell me & when I went in the loft to get something I went straight through the bedroom ceiling as there was no boarding present and damaged my left leg as that stopped me falling all the way through as it got caught on one of the cross beams. On checking they did not relay the loft boardings at all. Plus they damaged the main bathroom sink, and while installing the extractor fan made a big job of it. With broken bricks and large gaps. I know this was done under the eco4 scheme but now I am regretting it. No communication so far from the directors. Update: 2nd Dec I have been in communication with Muhammad Naeem (known as Nick) via WhatsApp. They have subsequently ruined my house by the second crew who could not communicate in English. My loft was fully boarded and screwed down with old insulation on top. They were supposed to 'Top Up' the insulation (according to the surveyor), instead they removed all of the boarding and never told me as the could not communicate with me. Consequently three weeks later I went into the loft to get Xmas decorations down and FELL through the ceiling with my right leg, my left leg stopping me falling further into the bedroom below causing a knee injury which is currently very painful. Also they cracked 2 bricks while fitting one of the air vents so water will ingress and freeze and crack further. Also, the outside vent is not flat with the brickwork and there is a large gap all around the plastic cover which will allow water to get ingress, freezer and then crack and wasps to could potentially nest in the gaps. They also, while fitting the wire from the ceiling light to the vent using conduit, due to the fact they ran out of conduit they just used white silicone in the shape of the conduit to finish it off, which I removed. I was communicating with Nick, the director of Powering Up Britain Ltd via WhatsApp on Saturday the 30th November 2024 and eventually the conversation completely changed tone, eventually implying I was a racist as I said to him they could not communicate to me in English, so the second crew never told me anything they had done, t what they were going to do, IE, removing the original boarding from the loft. Also while installing the extractor fan in the main bathroom the stood on the sink and caused it to come away from the surface to and dislodged all the waste piping. They left a right mess too. I have now made a formal complaint to TrustMark by telephone today (2nd Dec 24) as they have not conducted themselves as per their regulations and code of conduct set out. Nick had become very discourteous towards and became passive aggressive towards me and I will not stand for that behaviour especially from a director! Trading standards next?