Great Hybrid Experience, But Uncertainty About the Full Electric Upgrade
I had a Quatt hybrid heat pump installed and the installation went quickly and smoothly. The system has been working well and I was very satisfied with the result. Because of that good experience, I later decided that I wanted to go fully electric. I placed an order in 2025 to upgrade the system, also taking advantage of an early discount that was offered at the time. Quatt came to inspect the house and we looked for a suitable place for the installation. The main challenge is that my boiler is located in the attic, while the new system would need to be installed in the kitchen. The physical space in the kitchen is fine, but technically the installation is currently not possible. I contacted Quatt again and was told they are still testing solutions for this situation. However, after more than a year I am starting to doubt whether moving to the full electric system will actually happen. My first experience with Quatt was very positive, but this situation has made me less confident. I was also considering ordering the Quatt Chill, but at this point I think I will wait. I would prefer not to end up waiting another one or two years before that can be installed as well.